FD20-009 is the Final Development Plan for Phase 5 of the Woodbridge PUD (amended in Ord. 2016-05), allowing for 55 single-family residential and associated infrastructure on the east side of CR107, approximately 1.2 miles south of SR200/A1A.
The Board continued this item on April 20 to the May 4 meeting in order to hear testimony from Engineering Services staff regarding drainage issues in the Woodbridge/Clements Road area.
At that time, Engineering Services was preparing a drainage study with consultants Peters & Yaffee for the wetlands system north of Clements Rd running south through Woodbridge and outfalls into a ditch near Frank Ward Rd. Staff has previously reviewed these wetlands for blockages able to be removed under a maintenance permit with SJRWMD(dead vegetation debris or beaver dams, for example). The review found no physical blockages; therefore, the study will provide designs to mitigate the drainage concerns on Clements Rd in the County right of way.
The Board further continued the item to June 1 in order to review this study. A copy of the draft study received may 27, 2021 is attached with this item.
|